Utilities – Envirorment

PROJECT: PMPC 3rd Turn-Around Project

Period:                  Nov’14-Dec’14
Scope of work:        Turn-Around
Location:               Phu My IZ, Baria – Vung Tau
Owner (Client):        Phu My Plastics & Chemical Company Ltd.  (Asahi Glass Co., Ltd)

PROJECT: OSBD HVAC/Exhaust and Fire Protection Upgrade Project

Period:                  Mar’15 – Jun’15
Scope of work:        Engineering Design Service
Location:               VSIP I, Binh Duong Province
Owner (Client):        ON Semiconductor Binh Duong

PROJECT: PV Shipyard production base

Period:                  Dec. 08 – Jun. 09
Scope of work:        Engineering
Location:               Ba Ria – Vung Tau, Vietnam
Owner (Client):        PV Shipyard.

PROJECT: Fire fighting & Fire Protection System

Period:                   Apr. 08 – Sep. 08
Scope of work:         Engineering of Fire Fighting System
Location:                Hiep Phuoc IP, Nha Be Dist., Hochiminh, Vietnam
Owner (Client):         Saint – Gobain Construction Products Vietnam Ltd.

PROJECT: Firewater System Modification Project

Period:                   July. 06 – Mar. 07
Scope of work:         Construction of storage tank 1,000 m3, piping system, pump installation, electrical and control system.
Location:                Go Dau IZ, Dong Nai Province, Vietnam.
Owner (Client):         Exxon Mobil Vietnam Ltd.